14/4/14
Deadlift 96×5 120×4 145×3 167.5×3 180×3 204×3 168x3x3x3 1.5 minutes between sets
Shrug 112.5x10x10x10x10
Rack chins 20x10x10x9x8
T bar row 72.5x10x10x10x9
15/4/14
Bench press 48×5 60×4 72.5×3 84×2 102.5×1 90x8x8x8x8x8 1.25 seconds between sets
DB Incline press 23x10x10x10x8
Dips x9x5x5
17/4/14
Squats 75×5 92.5×4 110×3 130×2 118.5×1 111x5x5x5x5x5 1 min betweens sets
Calf raise on leg press 170x15x12x12
Sumo press 105x15x15
Leg press 165x15x15
21/4/14
Overhead press 45x8x8x8x8x8 2 minutes between sets
Front side raise 8x12x12
Face pulls 20x15x15
Reverse grip bench press on smith machine 62.5x10x10x10x10
BB curl 17x10x10x9x8
The time between the main basebuilding method working sets is coming down really low now I done the 5×5 squats in around 8 minutes maybe its time to move to the next phase for these, also this week I started using the basebuilding bench press model phase 1 for the overhead press.
This coming week im going to work upto my EDMs (every day maxes what my basebuilding sets are calculated on) to see how they feel and how easy/difficult they are to do.